On Friday, we had the 2nd item of the “big 3” that Tiffin is repairing on their own dime. First they did the top rails, and Friday they did the floor in the wet bay. So that is the cabinet that houses the outside connections etc for the sewer and water connections. In order to do that floor, they remove the water tank and leave the other 2 tanks suspended, cut out the floor and insert a new complete floor. The one they are taking out was from some kind of plywood and replaced it with a 1/2 inch PVC sheet. We saw these sheets when we did the factory tour. I don’t have a pic of that but some others from the tour to add.
The chassis and engine going in. A naked RV looks funny, below.
While it was such a nice day, although a little windy at times, we were outside a bunch. Here is Sadie with one of the other dogs, Tucker. He is a sweetie, just doesn’t like being confined and would get out of his collar too often, hence the harness.
Today was much colder, we walked in the heat of the day, 37 degrees at 330 pm. Our faces were frozen by the time we got back for 20 mins. Yikes. And now we are getting Freezing rain tonight and tomorrow. I really feel for the people all north of us cuz I know they have it worse. Tomorrow we have to have the driver side front slide empty for a floor replacement. I hope to have pics for that!